Bloomfield SS2 Series El manual del propietario

Busca en linea o descarga El manual del propietario para Cafeteras Bloomfield SS2 Series. Bloomfield SS2 Series Owner`s manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 15
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
DUAL HEADED SATELLITE BREWER
1/2, 1, and 1 112 gallon brew with New Digital Display System
Bloomfield Models:
SS2-BD 8 SS2-AD
-MANUFACTURED
Bloomfield Industries
2 Erlk Circle
P. 0. BOX 280
Verdi, NV 89439
U.S.A.
Fax (800) 358-5142
Ph (702) 345-0444
Introduction
Page 1
General Layout Data Sheet
Page 2
Features
Page 3
Warranty
Page 4
Safety
Page 5
Installation Instruction
Page 6
Leveling the Unit
Page 6
Plumber’s lnstallation Instruction
Page 6
Electrician’s lnstallation Instructions
Page 7
73386 Rev (A)
TABLE OF CONTENTS
Initial installation Instructions
Brewing Instructions
Bypass Valve Adjustment
Adjustment Instructions
Exploded View (Part 1)
Parts Identification (Part 1)
Exploded View (Part 2)
Parts ldentification (Part 2)
Ordering/Service Procedure
Wiring Diagram
Printed in February, 1998
Page 7
Page 8
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Vista de pagina 0
1 2 3 4 5 6 ... 14 15

Indice de contenidos

Pagina 1 - DUAL HEADED SATELLITE BREWER

DUAL HEADED SATELLITE BREWER1/2, 1, and 1 112 gallon brew with New Digital Display SystemBloomfield Models:SS2-BD 8 SS2-AD-MANUFACTUREDBloomfield Indu

Pagina 2 - INTRODUCTION

BREWING INSTRUCTIONSSelect Portion 1/2, 1 or 1 1/2 gallon.Place a single filter paper in Brew Chamber and add Coffee.(see below for recommendedounce o

Pagina 3 - GENERAL LAYOUT DATA

Pressing the Item key brings the user to the settings for volume #2, #3, and so on until #6. Recall that volumes #1,2 and 3 correspond to the ½ gallon

Pagina 5

EXPLODED VIEW (Part 2)SS2 SERIES12

Pagina 6 - WARRANTY POLICY

PARTS IDENTIFICATION (SS2 TANK ASSY & PLUMBING) ITEM SERVICE # DESCRIPTION QTY. 40 8541-120 VALVE SOLENOID 120V 1 41 8043-5 STRAP HOLD DOWN

Pagina 7

WIRING DIAGRAM(MODELS: SS2-BD & SS2-AD)I I I II - 1 ma II15

Pagina 8 - LEVELING THE UNIT

INTRODUCTIONBLOOMFIELD MODELS: SS2-BD 8 SS2-ADHI-QUALITY DUAL SATELLITE COFFEE BREWERWITH INDEPENDENT HOT WATER DRAW FAUCETThank you for purchasing a

Pagina 9

GENERAL LAYOUT DATA BLOOMFELD 1/2, 1 & 1 1/2 GALLON DUAL SATELLITE COFFEE BREWER MODEL: 882 SERES ELECTRICAL SPECIFICATIONS MODEL WATTS VOLTS

Pagina 10 - BYPASS VALVE ADJUSTMENT

FEATURESMODELS SS2-AD & SS2-BD DUAL SATELLITE COFFEE BREWER WITH HOT WATER FAUCET,manufactured by Bloomfield industries Inc., Is designsd to brew

Pagina 11

FEATURES000.00000000000000MODELS ss2-AD & ss2-BD DUAL SATELLITE COFFEE BREWER WITH HOT WATER FAUCET,manufactured by BloomfIeld Industries Inc., Is

Pagina 12

WARRANTY POLICYAll electrical products manufactured by Wells/Bloomfield are warranted against defectsIn material and workmanship by our authorized ser

Pagina 13 - EXPLODED VIEW (Part

THIS WARRANTY IS THE COMPLETE AND ONLY WARRANTY, EXPRESS OR IMPLIED IN LAWOR FACT, INCLUDING BUT NOT LIMITED TO WARRANTIES OF MERCHANTABILITY OR FITNE

Pagina 14 - PARTS IDENTIFICATION

INSTALLATION INSTRUCTIONREAD THIS COMPLETELY BEFORE STARTING THE INSTALLATION ACAUTION: DO NOT plug In or energize this unit until lnstallation lnstru

Pagina 15 - WIRING DIAGRAM

ELECTRICIAN’S INSTALLATION INSTRUCTIONSWARNING ELECTRICAL SHOCK HAZARD: Brewer must be properly grounded toprevent possible shock hazard.D0 NOT assume

Comentarios a estos manuales

Sin comentarios